Begin with what the joinery must do
List the items to store, how frequently they are used and who needs to reach them. Consider hanging space, shelf adjustment, drawers, appliance access and cable management. In an office, include equipment dimensions and maintenance access. A useful storage brief describes everyday tasks rather than only the number of cabinet doors.
Mark the available space and circulation around the proposed unit. Check door swings and the relationship to furniture, curtains and nearby openings. Discuss cleaning and likely wear with the designer so the selected details suit the intended use. The best internal arrangement may differ from the reference photograph that started the conversation.
Review measured shop drawings
Confirm who measures the site and when final dimensions can be taken. Walls, finished floors and ceilings may change during fit-out, so agree the measurement and fabrication sequence. Drawings should show elevations, sections and critical details clearly enough to explain the proposed construction, not simply repeat an attractive front view.
The Architectural Woodwork Institute describes drawings and samples as tools for communicating design intent through submittals. Use that principle to review dimensions, divisions and interfaces before release. AWI guidance is useful background; it is not being presented here as a mandatory Dubai rule or a claim that the project is AWI certified.
Reference: Architectural Woodwork Institute: purpose of submittals. Source checked 2 November 2026.
Approve materials and finish samples
Identify the proposed substrate, visible finish, edges and internal surfaces. Ask what the sample represents and record its reference, sheen and colour approval. Review physical samples under the intended lighting where possible. A screen image does not show every variation in texture or the way a finish reflects light.
For timber and other naturally variable materials, discuss the expected variation and how visible panels will be arranged. Clarify whether sample approval fixes a general appearance or a specific matching requirement. Agree the treatment of joints, exposed edges and touch-up areas so workshop assumptions do not become surprises during installation.
Coordinate hardware, appliances and services
Specify the functional requirements for hinges, runners, handles and locks, then confirm the selected products and relevant supplier information. Check appliance dimensions and installation instructions before enclosing equipment. Ventilation and service clearances should come from the applicable equipment requirements and coordinated design, not be guessed from a similar cabinet.
Show outlets, lighting, drivers and access panels on the relevant drawings. Assign responsibility for wiring and connections to the appropriate trades. Where joinery meets stone, metalwork or glazing, agree dimensions and installation sequence across suppliers. One approved drawing should not quietly contradict another package that is already in production.
Control the fabrication release and handover
Issue a dated approval record that identifies drawings, material samples, hardware and outstanding conditions. Agree who can release fabrication and how later changes will be priced. Check that revisions reach the workshop and that superseded drawings are withdrawn. A verbal change made on site needs to be recorded before it affects production.
At handover, inspect alignment, operation, finish condition and the agreed accessories with the supplier. Retain care instructions, product references and warranty information. Discuss cleaning products and maintenance through the finish and hardware suppliers rather than assuming one method is suitable for every material.
Common questions
Is a rendered image enough to approve bespoke joinery?
No. Review the drawings, materials, dimensions, hardware and interfaces that define what will be fabricated. A render supports that review but cannot replace those details.
When should the workshop take final measurements?
Agree the timing around the actual site and finishing sequence. Confirm which dimensions are final before releasing the affected components for fabrication.