Does the 3–4 week programme apply to every villa?

STORY & CORE uses an indicative 3–4 week period from inception to handover for vacuum lift planning discussions. Confirm the agreed programme against equipment availability, site readiness, structural review, any required approvals and timely finish decisions. This is a whole-project planning allowance, not a universal installation guarantee.

Read the occupied-villa installation guide before agreeing access, protection and work sequencing.

Start the programme with a clear initial brief

Inception means the beginning of the project discussion, not simply the day the equipment arrives. Share measured plans where available, photographs, floor-to-floor heights and intended stops. Describe who will use the lift and whether mobility aids or an accompanying passenger need to be considered.

Mark the preferred location on every served level. The first review should identify missing information and whether a survey or consultant assessment is needed. Record those dependencies alongside the target dates so an early estimate is not mistaken for an unconditional completion commitment.

Resolve the model and design before releasing work

Confirm the proposed equipment, entrance positions, machinery arrangement and finish selections. The coordinated drawing should distinguish the lift envelope, clear cabin, floor openings, landing approach and upper clearance. Dimensions should be recorded in millimetres and checked against the finished building.

Ask who approves the equipment layout and any structural or electrical interfaces. Establish the applicable approval route with the appointed project team. Prompt decisions support the planned sequence, while a late model or entrance change may require both the drawings and programme to be reviewed.

Prepare the site while protecting the home

Agree delivery access, a suitable work area and protection of nearby finishes. Confirm when the necessary building and electrical work will be ready for the installation team. Identify which party checks those conditions before equipment is brought into the villa.

Where people remain in residence, coordinate access to rooms and circulation routes with the contractor. Any temporary protection around openings belongs in the site arrangements. The overall 3–4 week planning allowance should account for these interfaces; equipment assembly time alone does not describe the complete project.

Coordinate installation, testing and remaining finishes

The agreed programme should show the installation sequence and how the surrounding trades will return to complete their work. Confirm the responsibility for reinstatement at landings and any finishing details that must wait until the equipment is positioned.

Ask the appointed team to identify the testing, inspection and documentation required for the actual installation. Do not schedule household use merely from the date assembly appears complete. The installation needs to reach its agreed handover condition before it becomes part of daily life.

Agree what handover and completion mean

Before the target handover, identify the operating instructions, responsible service contacts, warranty information and maintenance arrangements to be provided. Arrange an explanation of normal use and the selected model’s emergency instructions. Record outstanding items and their agreed resolution separately.

The indicative 3–4 week programme depends on the selected equipment, availability, site readiness, any required approvals and timely decisions. Confirm a project-specific schedule in writing. Share your preferred completion date with STORY & CORE early so the review can establish whether the target is workable.

Common questions

Does the 3–4 week period include planning and handover?

Yes. It is the indicative whole-project programme from inception to handover discussed by STORY & CORE, subject to project confirmation. It is not equipment assembly time alone.

Is completion within four weeks guaranteed?

No. Confirm the programme against equipment availability, site readiness, scope, any required approvals and decisions. Changes can affect the dates.

What can I prepare before the first discussion?

Have floor plans, photographs, heights, intended stops, user requirements and your desired completion date ready.

Continue planning your lift

References and scope

Manufacturer references explain general principles or their own equipment. They do not establish STORY & CORE partnerships, model certification or project-specific performance. Final specifications and responsibilities require confirmation for the proposed installation.

Review your villa drawings

Share your floor plans, intended stops and interior priorities with STORY & CORE. Start with home lift planning and confirm the equipment, building interfaces and agreed scope in the project proposal.