Describe the activity precisely

Separate simple storage, distribution, assembly, manufacturing and public-facing uses in the brief. Explain what enters the premises, what happens inside and what leaves. Include working hours, delivery patterns, staffing and any noisy, dusty or heat-producing processes. The licensing and property authorities need an accurate description to assess the proposed use.

Avoid relying on a listing description such as industrial unit or multipurpose warehouse. Ask for the approved use and drawings, then check the proposed operation with the relevant bodies. An office, workshop or showroom within a warehouse may require specific review. Existing alterations should be checked against records rather than accepted because a previous tenant used them.

Match storage to goods and fire design

Prepare an inventory by product type, packaging, storage method and maximum proposed height. Include aerosols, batteries, liquids and other items that may need specialist assessment. The fire design needs to reflect the actual storage arrangement; a generic statement that the premises has sprinklers does not establish suitability for every commodity.

Dubai Civil Defence submission guidance asks warehouse owners to describe materials and storage methods. Use that information early in the layout discussion. If the stock mix changes later, ask the appointed fire team whether the design and approvals remain suitable before accepting the new goods.

Source: Dubai Civil Defence: e-engineering submission manual, section 9.3. Checked 23 October 2026.

Measure capacity through the whole operation

Calculate positions for goods after allowing for receiving, dispatch, returns, damaged stock, circulation and safe access. The floor area on a lease is not the same as the area available for racks. Check usable height below beams and services, column spacing and the ability to move equipment between aisles.

Test the external operation too. Confirm vehicle access, dock arrangements, loading space and where vehicles wait. A unit can hold the required stock but still struggle with peak dispatch volumes. Prepare a simple flow plan and test a busy day before finalising the lease or ordering racks.

Identify services and specialist conditions

Record confirmed power capacity and the expected demand from equipment, lighting, charging and cooling. Check ventilation, drainage, welfare facilities and maintenance access. For temperature-sensitive goods, assess the building envelope and the complete refrigeration or cooling proposal; ordinary warehouse ventilation is not equivalent to controlled storage.

Food, medical products, hazardous goods and industrial processes can introduce additional licensing, environmental and technical requirements. Confirm the applicable specialist route for the actual products and activity. The lowest rent may be offset by a service upgrade or by a building that cannot economically support the intended operation.

Check yards, offices and future changes

Ask how the lease and authority rules treat outdoor storage, containers, signs and alterations. For example, the linked Trakhees operational requirements prohibit material storage and operational activities in the open yard outside the factory or warehouse building. Those requirements apply within their stated jurisdiction; do not assume another site has the same rules.

Record the permitted operation and fit-out as the baseline for occupation. A proposed mezzanine, denser storage, new office or different process should trigger a fresh review of use, structure, services and fire safety. Reassessing before the business changes helps avoid stranded equipment and disruption.

  • Document goods and peak stock volumes.
  • Check approved use against the proposed business activity.
  • Confirm loading, power and clear height on site.
  • Review changes before installing new equipment or accepting different stock.

Source: PCFC Trakhees: operational requirements, March 2023. Checked 23 October 2026.

Common questions

Can any warehouse be used for manufacturing?

Do not assume so. Confirm the licensed activity, approved building use, process requirements and authority permissions for the property.

Can the yard be counted as additional storage?

Only if the lease and relevant authority requirements allow the intended arrangement. Some jurisdictions expressly restrict outdoor material storage.

Further reading

More warehouse guides

Plan the next step

Explore project coordination with Story and Core. Share your property, available drawings and priorities so the project scope can be discussed.