Get the right documents for the actual unit
Ask building management for the latest manual, existing drawings, access rules and submission requirements. Confirm the unit boundaries and what the landlord is providing at handover. Record known limitations in the available information so the design team can arrange the necessary checks before treating an old drawing as an accurate survey.
Check which requirements come from the landlord and which come from the relevant authorities. Landlord consent and statutory permission are separate matters. DDA lists building-owner consent among its fit-out application documents, illustrating that owner approval can be part of a wider process rather than a replacement for it.
Reference: Dubai Development Authority: fit-out permits. Source checked 2 November 2026.
Clarify access and site logistics
Ask when contractors can enter, how workers are registered and which activities are restricted during occupied hours. Establish booking arrangements for loading bays, service lifts and waste collection. Check the practical route for large items before ordering them, including door openings, corners and any lifting restrictions.
Include protection of common areas, cleaning and waste removal in the scope. Identify who inspects the route before and after deliveries. Where the programme relies on evening or weekend work, confirm that the actual activities are permitted then and include the associated supervision and attendance arrangements in the budget.
Resolve service connections and interfaces
Request the available information on electrical capacity, cooling, ventilation, drainage and building fire systems. Ask which alterations require landlord-appointed specialists and how shutdowns are approved. The fit-out designer should verify what the tenant equipment needs against the actual available services before the layout is finalised.
Agree responsibility for testing and reinstating any affected shared systems. A quotation should identify connections, access requirements and exclusions clearly. If a proposed kitchen, server room or meeting area increases demand, resolve the technical and approval implications before assuming the existing unit can accommodate it without additional work.
Understand deposits and commercial conditions
List deposits, review charges, access charges and other building-related costs using the actual current documents. Identify who pays each item, when it is due and what evidence is required for release of a refundable deposit. Do not copy fees from another building or rely on an old tenant example.
Review insurance requirements, contractor eligibility and the lease obligations with the appropriate advisers. Establish the end-of-lease reinstatement basis as well as the initial fit-out rules. A finish retained from a previous occupier may still create a future removal obligation, so record the agreed starting condition and landlord acceptance in writing.
Turn requirements into a mobilisation checklist
Convert the manual into a short register showing the instruction, action, responsible party and evidence of closure. Link it to the programme and contractor scope. Resolve conflicts between the lease, manual and proposed works through the landlord and appointed advisers before mobilisation rather than relying on an informal site conversation.
Hold a pre-start meeting covering deliveries, emergency contacts, permitted work and reporting. Keep the approved layout and current instructions available to the site team. When building management issues a change, record its effect on method, cost and programme and communicate it to the affected suppliers.
Common questions
Does every Dubai building use the same fit-out manual?
No. Requirements vary by building, landlord, jurisdiction and the proposed work. Obtain current instructions for the specific unit.
Should landlord deposits be included in the project budget?
Yes, show them in the cash-flow plan and distinguish refundable deposits from non-refundable charges. Confirm release conditions in the actual documents.