Define what completion means
Write down the business requirements before asking for a duration. Confirm the unit condition, floor area, headcount, meeting rooms, specialist equipment and technology needs. Identify whether furniture, IT, branding and staff relocation belong in the contractor programme or are managed separately by the tenant.
Define the handover milestone precisely. Finishing decorative work is different from completing system tests, resolving defects and obtaining required completion permissions. Include the people who will operate the office so access control, network connectivity and support arrangements are considered alongside the construction scope.
Give design and approvals their own activities
Allow time to develop the layout, review building requirements and coordinate services before issuing construction information. Set dates for client decisions on layouts, finishes and equipment. A late meeting-room change can affect power, data, ceilings and furniture rather than just moving a partition.
Confirm the authority route for the building with the appointed team. DDA, for example, provides a fit-out permit process for properties in its jurisdiction. Its published service estimate should not be used as the duration for design, third-party reviews and the entire project. Record outstanding information and responsibility for each submission.
Reference: Dubai Development Authority: fit-out permits. Source checked 2 November 2026.
Check procurement before promising a move-in date
Ask suppliers for lead times against the exact specification and quantity. Separate stock availability from manufacturing, delivery and installation. Custom joinery, specialist doors, furniture and technology can require approved drawings or final measurements before production begins, so a purchasing date alone may not start the full lead time.
Create a procurement schedule linked to the design decisions. Identify acceptable alternatives early and record who can approve substitutions. If a proposed alternative changes dimensions, service requirements or appearance, coordinate those effects before ordering. Use confirmed supplier information when updating the programme rather than retaining an optimistic initial allowance.
Sequence site work and access
Agree delivery routes, working hours and noisy-work restrictions with building management. Review which work must be inspected or tested before it is concealed. Coordinate overhead services, partitions, ceilings and finishes so access remains available at the right stage. Include protection and cleaning rather than leaving them to the end.
Maintain a short look-ahead plan alongside the overall programme. Record decisions needed, materials due and interfaces between trades. Review actual progress against remaining work, not only a percentage complete. When a change is proposed, document its effect on time and cost before accepting a revised completion forecast.
Protect commissioning and relocation time
Reserve a defined period for testing, snagging, required inspections and staff familiarisation. Plan IT activation and equipment installation with the people responsible for them. Avoid placing every remaining task on the last day, especially where one supplier needs another system operating before it can complete its own checks.
Keep a fallback plan for the business if an essential item is delayed. Any phased occupation must be reviewed against the actual approvals and safe working arrangements. Use the programme as a decision tool throughout the project, with a current issue date, named owners and clearly stated assumptions.
Common questions
How many weeks does an office fit-out take?
There is no reliable universal duration. The starting condition, scope, authority route, supply lead times and building access need to be assessed before committing to a programme.
Can procurement start before all design work is complete?
Some items may be released early when their design and approval dependencies are resolved. Record the risk and release responsibility for each package.