Issue the same information to every bidder

Prepare a current drawing register, scope schedule and project requirements. Include the unit condition, landlord manual and any available building-services information. Give every bidder the same answers to material clarification questions so the comparison remains fair.

Identify the design stage and what is still unresolved. If the tender is based on a concept, ask bidders to state their assumptions. Do not compare a fully coordinated price with a preliminary allowance as if both carry the same level of definition.

Build a scope coverage matrix

List the main packages: partitions, ceilings, floors, joinery, finishes, services interfaces and specialist work. Add furniture, IT, signage and relocation where relevant. Mark whether each item is included, excluded or allowed provisionally in every offer.

Assign excluded items to a responsible party before calculating the overall budget. An exclusion is not necessarily a problem if it is intentional and covered elsewhere. The risk is an unassigned gap that becomes visible only when work is underway.

Review quantities, specifications and allowances

Check whether bidders have priced the same material quality, quantities and construction details. Ask for clarification where a product is described broadly. Compare sample approval and substitution procedures as well as the initial proposed finish.

Separate provisional sums from fixed items. Ask how an allowance will be measured or converted into a final price, and what information is needed. Keep a record of unresolved decisions so the owner understands the remaining cost exposure.

Assess delivery and completion commitments

Review the proposed programme against design decisions, required permissions, procurement and site access. Ask what the contractor needs from the client and other suppliers to meet the dates. A short headline duration is less useful than a sequence with credible dependencies.

Define handover documents, testing, defect closure and relevant completion responsibilities. DDA publishes a separate fit-out completion process for its jurisdiction; the project team must confirm the actual route for the building. Keep those requirements in the tender scope.

Record the basis of appointment

Close important qualifications before signing. Retain the agreed drawings, scope, specification, price breakdown, programme and change process as a consistent package. Confirm who can instruct variations and how cost and time effects will be approved.

Story and Core can discuss the office brief and coordination needs before a detailed proposal. Share the tender package and any existing offers to identify scope questions that should be resolved before the fit-out starts.

Common questions

Should I choose the lowest fit-out bid?

Assess the complete scope, assumptions, delivery capability and contractual terms alongside price. A lower total alone does not show better value.

What should I do with provisional sums?

Clarify what each allowance covers, how the final amount is established and which decisions are needed to replace it with a defined scope.

Related planning guides

Approval-process reference

Dubai Development Authority: fit-out permit and fit-out completion. These processes concern DDA jurisdiction; confirm the applicable route for the actual property and work.

Discuss your project brief

Share the property location, available drawings and priorities with Story and Core to establish the assessment and scope needed for the next step.

Discuss your office fit-out