Dubai villa planning checklist

A free, practical checklist for villa renovation and home lift planning. Read it here or download the printable version. No signup needed.

Download the PDF checklist ↓

Use it to prepare for a project conversation. Technical design and approval requirements depend on the actual property and scope.

Property and records

  • Record the full address, community, villa type and ownership or permission to commission the work.
  • Collect approved plans, available structural drawings and previous modification records.
  • Photograph existing conditions, defects and finishes to retain.
  • Confirm which rooms must remain usable if you stay in the home.

Family needs and layout

  • List essential outcomes separately from optional finishes.
  • Map daily routes between entrances, living areas, bedrooms and gardens.
  • Record mobility needs, storage priorities and privacy requirements.
  • Show proposed furniture and door swings on a measured plan.

Home lift feasibility

  • Ask for a survey and a dimensioned supplier proposal for every served floor.
  • Confirm cabin, enclosure, doors, landings, support conditions and service access.
  • Have structural and services implications assessed by the appointed professionals.
  • Clarify who provides civil works, power, finishes, testing and making good.

Approvals and site logistics

  • Ask current community management for the property-specific modification process.
  • Have your consultant identify separate authority reviews applicable to the scope.
  • Confirm working periods, contractor access, deliveries and waste arrangements.
  • Sequence procurement around confirmed drawings, surveys and required responses.

Quotation comparison

  • Issue the same drawings and written scope to each contractor.
  • Separate products, civil works, services, finishes and professional responsibilities.
  • List exclusions, provisional items, payment milestones and change procedures.
  • Agree samples, lead times, warranties and aftercare in writing.

Completion and handover

  • Inspect the agreed work and record a snagging list with responsibilities.
  • Collect relevant approvals, final drawings, warranties and equipment information.
  • Arrange user instruction and maintenance contacts for installed systems.
  • Keep records together for future maintenance and alterations.