Start with the existing bathroom and intended use
Record the current layout, known defects and household needs. Explain whether the project changes fixture positions, adds equipment or simply renews finishes. Ask the appointed team what investigation is needed before confirming the scope.
Collect any available drawings and product information. In an existing villa, concealed conditions may need assessment during the work. Agree how discoveries will be reported and priced rather than assuming a fixed cosmetic scope covers every underlying issue.
Resolve fixture layouts before procurement
Select fixtures using manufacturer dimensions and installation information. Coordinate door movement, storage, shower access and cleaning space on the measured layout. A catalogue image does not establish that a product fits the room or existing services.
Ask the responsible specialists to assess proposed changes to drainage and other services. Any structural or permission implications must be reviewed through the project team. Do not move a fixture solely because the new position looks better on a concept plan.
Assign waterproofing and concealed-work responsibilities
Request a coordinated specification and method from the responsible professionals and contractors. Identify the waterproofing system, interfaces and required inspections or tests through that process. The owner should know who approves concealed work before finishes cover it.
Retain the relevant records and product information in the project file. Confirm how penetrations, thresholds and junctions are coordinated between trades. This is a responsibility checklist, not a substitute for a project-specific waterproofing design.
Coordinate materials, lighting and access
Review tiles, stone, joinery and lighting as a combined palette. Obtain product information appropriate to the intended use and discuss care requirements. Decide how service valves, equipment and other maintainable items remain accessible in the completed room.
Approve samples and key junctions before installation. Show tile setting-out, edges and fixture positions on the relevant drawings so the visual design does not depend on last-minute site decisions.
Define bathroom handover beyond appearance
Agree the required inspections, functional checks, defect closure and documentation with the appointed team. Obtain care instructions and warranty responsibilities for the installed systems and products. Record outstanding items with an owner and target date.
Bring Story and Core your existing layout, intended changes and finish references. A clear interior brief helps connect the bathroom design with technical coordination and the wider villa renovation programme.
Common questions
Can a bathroom renovation be treated as finishes only?
Only if the assessed scope supports that approach. Fixture changes, concealed defects and services can expand the work and need specialist review.
Who approves waterproofing before tiling?
The project appointments and inspection plan should identify the responsible contractor, designer and any required inspection parties.