Specify the complete floor build-up

A finish name does not describe the installed floor. Ask the designer and supplier to identify the visible material, substrate and other layers included in the proposed build-up. Submit the complete arrangement for the lift supplier’s acceptance before procurement.

The supplier must confirm the applicable weight and dimensional limits for the equipment. Do not calculate an allowance from the passenger capacity alone. A cabin’s rated load does not independently authorise a change to its fixed finishes.

Compare natural stone and alternatives

Review the appearance of natural stone alongside suitable stone-look options that the supplier permits. Discuss variation, joints, edges and care requirements using physical samples. The objective is a coordinated result rather than forcing one material into an unsuitable application.

Ask the material supplier how the proposed finish should be maintained in that setting. Consider how dirt and moisture may reach the cabin from parking or outdoor areas. Keep performance claims tied to the selected product rather than assuming every polished stone behaves alike.

Coordinate floor levels and thresholds

Show the finished cabin floor and landing junction on the project detail. Ask the lift supplier to confirm the permitted build-up and entrance arrangement. Changes made late in procurement can affect the approved detail and require another review.

Bring the adjacent villa flooring into the same discussion. Decide how pattern, joints and colour relate across the entrance, while retaining the equipment’s required geometry. A photograph of a continuous floor does not explain how the threshold was technically resolved.

Approve the visual sample and technical submission separately

Record the material reference, thickness and finish sample that the owner approves. Then retain the supplier’s acceptance of the actual installation arrangement. Approval of colour and pattern is not the same as approval for use within a lift.

Clarify who supplies and installs each layer, who checks dimensions and who protects the completed surface. Where a specialist stone contractor is involved, give that contractor the accepted detail rather than an interior rendering alone.

Include flooring in the handover review

Inspect the finish condition, edges and junctions with the responsible suppliers. Obtain product care instructions and clarify how future replacement would be handled. Keep spare-material information where relevant without assuming a later batch will match exactly.

Story and Core can discuss lift flooring alongside cabin panels, lighting and landing finishes within the agreed scope. Share the proposed material and model early so the design can develop around confirmed requirements.

Common questions

Can I put marble in any home lift?

No. The selected supplier must approve the material and full build-up for the specific equipment.

Is the passenger load the flooring allowance?

No. Ask the supplier to confirm the permitted fixed finish weight and specification separately from the lift’s rated passenger load.

Related planning guides

Discuss your project brief

Share the property location, available drawings and priorities with Story and Core to establish the assessment and scope needed for the next step.

Plan your luxury villa elevator