Map the office and warehouse activities together

Describe who uses the office, how often visitors arrive and what staff need to oversee. Mark receiving, storage, dispatch and vehicle movements on the same plan. Include meeting rooms, records, staff facilities and technology rather than treating the office as a desk count alone.

A ground-floor office uses part of the operational floor area and needs suitable access. A mezzanine proposal introduces a different set of structural, circulation and building questions. Compare the complete arrangements before assuming that an upper level simply creates spare space.

Establish what exists and what is proposed

Collect approved drawings and records of previous alterations. Identify whether a mezzanine already exists, whether its documented use matches the proposal, and what new work is intended. Ask the responsible specialists to assess the structure and intended loads rather than relying on the appearance of an existing platform.

Keep the assessment tied to the actual office use, furniture and equipment. If structure, stairs or other building elements need modification, show those packages separately from decorative fit-out. A partition contractor’s price does not establish that the underlying arrangement is suitable.

Confirm the jurisdiction and permission route

Ask the appointed team to identify landlord, authority and specialist reviews for the property. DDA’s published guidance distinguishes ordinary fit-out work from changes requiring a building-modification route within its jurisdiction; its circular identifies adding a mezzanine as a modification matter.

That reference is not a universal permit checklist for every Dubai warehouse. Confirm the current route, drawings and completion requirements with the relevant parties before construction. Existing approvals or a small office area do not automatically remove the need for review.

Coordinate comfort, services and technical interfaces

Have the appropriate specialists assess air-conditioning, ventilation, power, data, fire-safety interfaces and other requirements for the proposed office. Review noise and privacy needs alongside the warehouse activities. Avoid designing an enclosure first and asking later whether the existing systems can support it.

Coordinate the IT provider’s equipment and routing requirements before ceilings or partitions close. Define access for maintenance and any interruptions to warehouse operations. Keep specialist design responsibilities and required checks explicit in the appointment.

Issue a complete office fit-out brief

Compare proposals covering design, assessed building work, services interfaces, interiors, technology and handover. Identify furniture and other client-supplied items separately. Link the programme to permissions, procurement and operational access, with clear responsibilities for each dependency.

Share the warehouse plans, intended office use and any existing mezzanine information with Story and Core. The next discussion can connect workplace design with warehouse operation and establish the specialist assessments needed before a detailed proposal.

Common questions

Is a mezzanine office only an interior fit-out?

Do not assume so. New or altered structure, use and access can require a different assessment and approval route. Confirm the actual scope with the appointed team.

Can warehouse operations continue during office construction?

That depends on the work, site controls, access and service interruptions. Review phasing before committing to uninterrupted operations.

Related planning guides

Sources and scope

Authority references concern their stated jurisdiction. Confirm the current route for the actual property and proposed work.

Discuss your Dubai project

Share the property location, available plans and priorities with Story and Core to establish the next assessment and a clear scope.

Discuss your requirements