Agree the handover deliverables early
Set out the records and activities required by the contract and applicable approval process. Assign responsibility for final drawings, test results, equipment information, warranties and maintenance contacts. Identify whether tenant-supplied furniture and IT need to be integrated into the completion review, and who coordinates those suppliers.
Use a deliverables register with an owner, due date and acceptance status. Distinguish draft information from the final record of what was installed. If documents are to be supplied digitally, agree folder names and usable formats so the facilities team can find a circuit schedule or product reference without searching through unrelated correspondence.
Inspect the work against the agreed scope
Walk the space with the appointed team and compare it with the approved design and contract requirements. Record defects by location, description, photograph and responsible party. Separate minor finishing items from problems affecting safe operation, essential services or required approvals. Agree how each will be verified after correction.
Test representative daily activities as part of the operational review. Check room access, storage, door operation and the usability of work areas with the relevant suppliers. Specialist systems need their specified commissioning and competent sign-off; a client walk-through does not replace the testing or inspections required for those systems.
Check the authority completion route
Confirm which completion documents apply to the property and scope. DDA describes its Fit-Out Completion Certificate as confirmation of compliance with approved drawings. This is one jurisdiction-specific process, rather than a checklist that automatically applies to every office in Dubai. The appointed team should identify the correct route for the building.
Keep authority completion records separate from the contractor snag list and the commercial account. They address different obligations. Confirm outstanding comments and the agreed sequence for closing them before assuming the office is ready for occupation. Owner acceptance of finishes alone does not establish that all required permissions have been obtained.
Reference: Dubai Development Authority: fit-out completion. Source checked 2 November 2026.
Transfer knowledge to the operating team
Arrange demonstrations and training for the people who will use and maintain the installed equipment. Record relevant operating procedures, isolation information and service contacts through the qualified suppliers. Confirm the process for routine maintenance, fault reporting and emergency assistance, including any support arranged directly by the tenant.
Review warranty conditions and the maintenance actions needed to preserve them. Identify consumables, spare keys, access credentials and replacement product references. Transfer sensitive access information securely to the authorised owner rather than leaving it in a general shared handover folder or on a label visible to visitors.
Close outstanding items with clear evidence
Agree dates for returning to correct defects and how access will be arranged after occupation. Keep an updated register and obtain evidence that corrections have been checked. Confirm the contractual process for completion, payment and defects management with the appointed adviser; a generic checklist should not rewrite those terms.
Schedule an operational review after staff have used the office. Practical issues with storage, controls or meeting-room equipment may become clearer during normal use. Record those observations and distinguish a defect from a new requirement, then use the agreed change process for additional work.
Common questions
Should the tenant accept handover with defects outstanding?
Assess the nature of each item against the contract, required approvals and operational needs with the appointed team. Minor finishing issues and unresolved essential systems need different treatment.
Are as-built drawings useful for a small office?
Yes. Reliable records help with maintenance, fault finding and future alterations, even when the fit-out is modest. Agree the required scope and format before construction.