Start with the two premises
Collect the new unit's available drawings, condition information and building-management guidance. Arrange a survey so the design team can compare those records with the actual space. Identify what is being retained, removed or added instead of assuming the previous tenant's layout will suit your business.
Review the current premises separately. Ask the responsible adviser or property contact to clarify your exit and reinstatement obligations. Record the access and handback arrangements that need to be coordinated with the move. Treat unresolved lease questions as items to confirm before fixing the programme.
Translate headcount into a working brief
List the teams using the new office, their working patterns and the spaces they need. Include focused work, meetings, calls, storage, reception and any specialist functions. Identify furniture and equipment you plan to reuse, with measurements and condition checks where relevant.
Test the proposed layout against everyday activities. A meeting room that fits on a plan may still need a better relationship with reception or nearby workstations. Storage can occupy valuable circulation space if it is added after the layout is approved. Resolve those decisions while changes are easier to coordinate.
Use the office fit-out scope checklist to turn the brief into a clearer quotation package.
Map the requirements for the actual building
Ask your appointed project team to identify the relevant authority, landlord and building-management processes for the unit and proposed work. Record submission responsibilities, information required and dependencies between design, permissions, construction and completion.
For projects within its remit, the Dubai Development Authority's fit-out completion service concerns compliance with approved drawings and lists supporting documents. That is one jurisdiction's process; your team should confirm the route applicable to your office. Do not turn a published service processing estimate into a promise for the full fit-out programme.
Build a programme around dependencies
Show more than a construction start and finish date. Include survey completion, layout approval, coordinated technical information, relevant permissions, material decisions, procurement, installation, testing and handover. Identify which items prevent the next activity from starting.
For example, a furniture delivery date is only useful if the required access and receiving area will be available. A partition change may also affect the coordinated services layout. Ask the team to show the consequences of late client decisions so the business can prioritise approvals.
Compare a proposed move date with the remaining dependencies. Where dates are unconfirmed, label them as assumptions and assign someone to obtain confirmation.
Give IT and business continuity their own workstream
Include your IT team or provider before finalising workstation and meeting-room plans. Confirm the intended equipment locations, connectivity requirements and responsibilities for installation and testing. Establish who verifies that the systems needed for opening day work as intended.
Plan the physical move with the same care. Identify files, equipment and furniture that need labelling, protection or specialist handling. Decide which teams can work remotely, which functions need uninterrupted access and who approves the final move instruction.
Separate fit-out costs from relocation costs
Keep the contractor's package alongside direct purchases and relocation expenses. Depending on the agreed scope, furniture, IT services, moving, storage, temporary working arrangements and old-office works may sit outside the construction price.
Use the office fit-out budget guide to identify scope boundaries. A consolidated budget should show who supplies each item and whether its price is confirmed, provisional or awaiting a quotation.
Plan the new office around your business
Explore office fit-out in Dubai with Story & Core. Bring your proposed unit details, target dates and team requirements to start a more focused scope discussion.
Common questions
When should we choose the move date?
Set a target early, then validate it against the surveyed scope, design decisions, applicable processes, procurement and readiness checks. Confirm the operational move when the responsible teams have reviewed the remaining dependencies.
Can we reuse our existing furniture?
Assess its condition, dimensions and suitability for the new layout. Include dismantling, transport and reassembly responsibilities before assuming reuse will reduce the total cost.
Is a visually finished office ready to occupy?
Appearance alone does not establish readiness. Have the appointed team confirm the applicable completion requirements and check the systems, access and information your business needs before moving.