Establish the unit’s actual condition
Record what is physically present: floor and ceiling condition, partitions, lighting, air-conditioning provisions, power and fire-system interfaces. Ask for the landlord’s handover information and identify which installations belong to the building or previous tenant. Photographs help document the starting condition.
Terms used in listings can be interpreted differently between properties and transactions. Ask the landlord or agent to explain the specific handover scope in writing. Do not budget from the label alone or assume that an existing installation is suitable for the new layout.
Define what your business needs to add
Prepare a workplace brief covering headcount, work settings, meeting rooms, reception, storage and support spaces. Decide whether furniture, IT, access control and branding sit within the fit-out appointment or separate contracts. This turns an accommodation requirement into a scope that can be priced.
Where a fitted unit is available, compare what can genuinely be retained with what must change. Reuse may affect layout flexibility, warranties and service coordination. Have the responsible specialists assess systems rather than assuming an existing ceiling means the technical work is complete.
Review building and approval requirements
Request the landlord fit-out manual and available services drawings before developing the construction package. Confirm access rules and the required submission process for the building. The relevant authority route depends on location and the nature of the work.
DDA’s published permit process is one jurisdiction-specific reference; it is not a rule for every Dubai office. Ask the appointed team to establish applicable permissions, any modification route and completion requirements for the proposed scope.
Compare total occupancy preparation costs
Separate construction from professional appointments, deposits, technology, furniture, relocation and other tenant costs. Identify landlord or existing-condition items that need investigation. Use allowances openly where the scope cannot yet be fixed.
When comparing premises, consider the work needed to reach an operational office rather than comparing rent and appearance alone. A more finished unit may still need substantial changes to support the team. A bare unit may offer flexibility but require more design and construction work.
Issue a written handover-to-occupation plan
Record the starting condition, retained installations, new scope, permissions and handover expectations. Give the same information to each bidder. Ask each proposal to identify assumptions and exclusions against that schedule.
Share the unit plans, handover description and intended opening date with Story and Core. The office fit-out discussion can then focus on the gap between what the landlord provides and what the business needs to operate.
Common questions
Does Cat B mean an office is ready for my team?
Not necessarily. Check the actual furniture, technology, services, permissions and operational requirements against your brief.
Is shell and core always cheaper to fit out?
The total depends on the unit condition and required scope. Compare itemised proposals and the work needed for occupation, rather than relying on the label.
Related planning guides
Approval-process reference
Dubai Development Authority: fit-out permit and fit-out completion. These processes concern DDA jurisdiction; confirm the applicable route for the actual property and work.
Discuss your project brief
Share the property location, available drawings and priorities with Story and Core to establish the assessment and scope needed for the next step.