Obtain the actual delivery information

Ask the supplier for the size, weight and handling requirements of the delivered components or packages. Distinguish shipping packaging from the dimensions of assembled equipment. Do not assume that a model which fits the finished location can pass through every doorway on its route.

Mark the receiving point, unloading area and proposed path through the property. Ask the installer to confirm the route against the actual component information. If specialist handling is necessary, identify who plans, provides and prices it in the proposal.

Walk the route through the villa

Review gate openings, entrance doors, corridors, turns, steps and any change in level. Consider overhead features and finished surfaces as well as floor space. The installer should determine whether the route is usable and what further information is needed.

Record constraints with measurements and photographs for the responsible team. If a door leaf or decorative element must be removed, agree who removes and reinstates it. Keep the owner’s approval and the reinstatement cost separate from an assumption that the installer will handle everything.

Agree site and community access

Check delivery booking rules, vehicle access, permitted working hours and any community requirements with the relevant management team. Share these restrictions with the supplier before fixing transport arrangements. A delivery slot and a construction access permit may be separate matters.

For an occupied home, agree which rooms and entrances remain available to the household. Protect a suitable route and keep children and visitors away from the work area under the contractor’s site arrangements. Explain planned interruptions before the delivery team arrives.

Provide suitable storage and protection

Ask the supplier how equipment must be stored if installation cannot start immediately. Confirm the permitted environment, security and packaging arrangements, and who accepts the delivery. Identify how damage or missing items are recorded and reported.

Coordinate protection of stone, timber, glazing and completed joinery along the handling route. Avoid treating protection as a general allowance with no responsible party. The logistics plan should show who supplies it, when it is installed and when it can be removed.

Tie delivery to site readiness

Review the supplier’s readiness checklist before dispatch. The receiving route, work area and relevant building interfaces should match the installation plan. If site work is delayed, clarify storage, redelivery and rescheduling arrangements before equipment is in transit.

Story and Core can discuss delivery and interior interfaces as part of the agreed villa lift brief. Share property access restrictions alongside the plans so the quotation and programme account for the way the equipment will actually reach its location.

Common questions

Who checks whether components fit through my entrance?

The supplier or installer should assess the measured route against the actual delivery information. The project proposal should identify that responsibility.

Is specialist lifting always included?

Do not assume so. Ask the quotation to identify handling, access equipment, protection, storage and any exclusions.

Related planning guides

Approval-process reference

Dubai Development Authority: fit-out permit and fit-out completion. These processes concern DDA jurisdiction; confirm the applicable route for the actual property and work.

Discuss your project brief

Share the property location, available drawings and priorities with Story and Core to establish the assessment and scope needed for the next step.

Review your vacuum lift brief