Start with the existing structure, not the brochure footprint
Collect available structural drawings, architectural plans and records of previous alterations. Mark the proposed lift position at every served level, including the top landing. A circular outline on an interior plan does not explain what lies inside a slab or how the lift interfaces with the building.
Ask the engineer what surveys or investigations are needed to assess the proposed position. Do not assume that a location beside a staircase is structurally clear. The engineer must determine the assessment needed for the particular villa; the lift supplier provides equipment requirements rather than approving the building structure.
Coordinate the opening with the selected model
The supplier submission should identify the required opening, tolerances, finished floor levels and any specified support or fixing interfaces. Cross-reference its drawing revision on the structural and architectural information. Distinguish an equipment diameter from a construction opening and from the space needed to finish and use the landing.
If the preferred model changes, revisit the opening before releasing work. Record who checks the interface and who issues the construction drawing. An installer should not arrive to find that a contractor has formed an opening from a marketing diagram or an earlier design.
Keep temporary works and protection in the brief
Ask the appointed team to define temporary protection, restricted areas and the sequence for opening and making good each floor. The household needs a clear access plan during the work. Any structural or temporary works method must be developed by the responsible professionals and contractors.
Include nearby ceilings, floors and services in the assessment. Agree what must be relocated and who will reinstate it. Existing finishes may not be available in matching batches, so decide whether a local repair or a broader landing finish is acceptable before construction starts.
Confirm the approval route and inspection points
The applicable permissions depend on the location and proposed alteration. Ask the project team to establish the community, building-management and authority requirements before work begins. Dubai Development Authority distinguishes fit-out work from changes that may require a building modification application within its jurisdiction.
Keep permission responsibilities in the appointment rather than assuming they belong to the equipment package. Agree which interfaces must be checked before concealment and what records will be retained. This helps the owner distinguish an approved design from a verbal statement that an installation is possible.
Release one coordinated package
Before procurement, compare the latest lift drawing, structural information and interior layout together. Confirm the model, floor levels, landing access, opening dimensions, finishes and scope exclusions. List unresolved items and identify whether they prevent ordering, building work or installation.
Share those documents when requesting a proposal from Story and Core. A useful next step is a review of the villa layout and supplier interfaces, followed by a written scope showing how lift work, civil work and interior reinstatement are divided.
Common questions
Does a vacuum lift avoid all structural work?
No general promise covers every villa. The selected equipment and proposed route determine the building interfaces, and an engineer must assess any affected structure.
Can I use the catalogue diameter to cut the slab?
No. Construction work must follow the coordinated project drawings and the responsible engineer’s assessment, with the selected supplier’s current requirements.
Related planning guides
- Vacuum lift space planning
- Home lift civil works
- Story and Core residential catalogue
- Vacuum lifts service
Approval-process reference
Dubai Development Authority: fit-out permit and fit-out completion. These processes concern DDA jurisdiction; confirm the applicable route for the actual property and work.
Discuss your project brief
Share the property location, available drawings and priorities with Story and Core to establish the assessment and scope needed for the next step.