Explain how the household uses the villa
Tell the team which bedrooms, bathrooms and living spaces must remain accessible. Mention children, pets, carers and anyone who depends on a particular route between rooms. This information helps the appointed contractor review the work arrangements around the household rather than treating the villa as an empty site.
STORY & CORE uses an indicative 3–4 week programme from inception to handover for planning discussions. Confirm the project-specific dates and periods of disruption separately. A whole-project duration does not mean every room is affected for the same time, and it does not establish that remaining in the home is suitable in every case.
Check the delivery route before equipment arrives
Review the route from the delivery point to the proposed lift position. Show entrance doors, corridor turns, steps and finishes that need protection. Ask the supplier to confirm the handling requirements for the selected equipment and identify who is responsible for the route and temporary storage.
If vehicle access or working hours are controlled by the property or community, have the appointed team confirm the arrangements that apply. Do not assume that a compact finished lift means every component can pass through the existing entrance without a delivery review.
Separate the work area from everyday circulation
Ask the contractor to explain how the work zone will be controlled and how the household will move around it. Review access at every proposed landing, not just the ground floor. Any temporary protection, restricted route or alternative arrangement should be clear before works begin.
Where floor openings or structural changes are proposed, the appointed professionals must establish the method and protection appropriate to the site. Homeowners should not remove temporary barriers or enter the installation area because work appears paused. Use the agreed contact route for questions about access.
Protect finishes and coordinate noisy work
Identify the stone flooring, joinery, decorative ceilings and nearby furniture that may be affected. Agree protection and reinstatement responsibilities in the scope. Keep material selections coordinated with the installation drawing so newly finished areas do not need avoidable rework.
Discuss the likely work activities and timing with the contractor, including any tasks that affect a home office or bedroom. The project team should confirm what is actually required; avoid relying on a general claim that every pneumatic lift installation creates no dust, noise or building disruption.
Plan the move from work zone to daily use
Before the lift enters service, agree the testing and handover requirements for the selected installation. Arrange completion of the surrounding floor and wall interfaces and record remaining items. Household use should follow the appointed team’s agreed handover, rather than an informal test journey.
Obtain the operating instructions and responsible contacts, then discuss cleaning and ongoing care with the supplier. Send STORY & CORE photographs of the delivery route and proposed landings alongside your plans. These practical details help frame an installation discussion that considers the people living around the work.
Common questions
Can we stay in the villa during vacuum lift installation?
This depends on the scope, work arrangements and household needs. Ask the appointed project team to assess access, work-zone separation and any temporary alternatives before deciding.
Will the installation create no disruption?
Do not assume that. Confirm the required building work, delivery handling, protection, work activities and reinstatement for your villa.
Continue planning your lift
References and scope
- STORY & CORE residential catalogue: confirm current model specifications
- PVE manufacturer installation guidance: general planning reference, not an SC specification
Manufacturer references explain general principles or their own equipment. They do not establish STORY & CORE partnerships, model certification or project-specific performance. Final specifications and responsibilities require confirmation for the proposed installation.
Review your villa drawings
Share your floor plans, intended stops and interior priorities with STORY & CORE. Start with home lift planning and confirm the equipment, building interfaces and agreed scope in the project proposal.